Download a case study on the benefits of parallel prototyping in component design by Heatron.

Case Study: Parallel Prototyping and the Engineer’s Dilemma

In the high-stakes practice of regulatory compliance, balancing development costs with speed, safety and performance are critical to a product's success. This paper demonstrates how the parallel prototyping of two materials in a heating component contributes to the return on investment of a new product launch in the medical device industry.

The study addresses the verification, validation, form and fit testing relative to the FDA approval process, as well as its execution within component design, product design and pilot production. 

Download the case study now.